Small, but effective pilots are key to reducing risk of a full-field deployment of a water or CO2 flood. The key is to know the full field objectives so that the duration, scale, and pilot site is chosen such that the pilot results are scalable and representative of the field. A remarkable and overlooked challenged to assessing pilot results is establishing a baseline that can be projected so that incremental oil recovery to the baseline can be demonstrated.
I am able to work with you to design and analyze results of pilot tests and interpret fullfield responses to water and CO2 injection.
Illinois Basin CO2 EOR pilot Design
Image of baseline projection and CO2 EOR
Importance of established baseline to correctly define the portion of production attributable to CO2 injection. Very difficult due to pre-pilot well work enhancements to oil production. |
– Site screening and selection
– Water floods · Design and forecast · Design and deploy pilots – CO2 floods · Design and forecast · Design and deploy pilots – Scale results to full field |